Rigsnapper is a cross-platform mobile application (iOS & Android) purpose-built for telecom rigging teams. It empowers field technicians to capture, categorise, and submit high-quality site images directly from the job site — eliminating manual documentation, reducing submission lag, and enabling seamless real-time collaboration with the HOP (Head of Project) team.
Capture photos directly within the app using front or back camera. Each image is tagged to a specific category — Sector (x), General, DICI, or DNO — ensuring every shot is contextually classified from the moment it is taken.
A two-screen workflow guides the rigger to first select the Client and Site ID before capturing any image. This structured approach ensures every photo is automatically associated with the correct project.
Every captured image is automatically watermarked at the bottom left with the Site ID, Section/Category name, and exact timestamp of capture — providing tamper-evident, audit-ready documentation.
The built-in Gallery consolidates all captured images with clear visual indicators showing upload status (pending vs. successfully uploaded). View images in full-screen, crop, share, or bulk-manage them.
Long-press any image to enter multi-select mode. From there, select all, delete, upload to the server, or share images in one action — dramatically reducing submission time.
Quickly locate any client or site using the built-in search. Switch between project-specific and full-history gallery views. Full-screen mode enables detailed image review with crop editing before submission.
From the guided capture flow to the watermarked output and project dashboard — Rigsnapper digitises every step of telecom site documentation.
Structured workflows reduce site documentation time significantly — images are submitted the moment work is complete.
Mandatory Client & Site ID selection before capture guarantees every image is correctly attributed — no re-work, no guesswork.
Auto-watermarking with site, category and timestamp data creates audit-ready records that meet project and regulatory documentation standards.
Real-time image uploads keep the HOP team informed without waiting for end-of-day reports or manual handovers.
Capturing and submitting site images manually causes delays and communication gaps. Rigsnapper guides every image to be instantly classified, watermarked, and uploaded — with zero manual paperwork.
Waiting for end-of-day handover of site photos creates bottlenecks. Real-time uploads give HOP teams instant access to structured images as work progresses.
Audit trails require timestamped, site-attributed evidence. Auto-watermarking generates verifiable, tamper-evident photographic records for every audit.
Managing images across dozens of clients with generic photo apps leads to disorganised archives. Rigsnapper keeps every project documented, searchable, and separate.
Rigsnapper is available now on iOS and Android. Join rigging teams already submitting faster, documenting smarter, and collaborating better with their project offices.